Recent work.
A selection of finished roofs and in-progress installs from Bend, Redmond, Sisters, and the rest of Central Oregon. Asphalt shingle, standing-seam metal, chimney flashing, ridge venting — every image is a real job.

Re-roof with new chimney flashing
Materials: Architectural asphalt shingle + new chimney flashing
Problem: Aging roof with chimney transition details that needed to be rebuilt during replacement.
Scope: Tear-off, deck check, synthetic dry-in, new shingles, and chimney flashing integration.
View roof replacement →
Hip roof with ridge vents
Materials: Architectural asphalt shingle + ridge ventilation
Problem: Older roof needed a clean replacement with balanced ventilation details.
Scope: Re-roof with ridge vent layout, starter, cap, and cleanup at project close.
View roof replacement →
Architectural shingle, stone chimney
Materials: Architectural asphalt shingle + chimney flashing
Problem: Stone chimney transition required careful flashing during roof work.
Scope: Shingle installation with chimney-to-roof flashing attention and water-shed detailing.
View chimney flashing repair →
Standing-seam metal roof
Materials: Standing-seam metal
Problem: Project needed a durable roof system with clean snow-shedding characteristics.
Scope: Metal roof installation with trim, ridge, and flashing details coordinated to the structure.
View metal roofing →
Craftsman re-roof in progress
Materials: Architectural asphalt shingle
Problem: Existing roof was ready for replacement and needed a clean dry-in during the work window.
Scope: Tear-off, synthetic underlayment, shingle install, and staged cleanup during installation.
View roof replacement →
Finished hip roof, dump trailer staged
Materials: Architectural asphalt shingle
Problem: Full roof replacement with multiple planes and site cleanup logistics.
Scope: Complete tear-off, new shingle system, ridge cap, and debris removal.
View roof replacement →
Bay window dormer, sunset
Materials: Architectural asphalt shingle + flashing details
Problem: Bay window and dormer transitions need careful flashing to prevent wind-driven leaks.
Scope: Detail work around shingle courses, transitions, and roof edges.
View roof repair →
Low-slope membrane tie-in
Materials: Low-slope membrane
Problem: Low-slope section needed membrane work instead of standard shingles.
Scope: Membrane tie-in, edge detailing, and transition planning to shed water correctly.
View tpo / epdm low-slope roofing →
Synthetic underlayment, mid-install
Materials: Synthetic underlayment + architectural asphalt shingle
Problem: Roof needed dry-in protection during a replacement schedule.
Scope: Deck inspection, synthetic underlayment installation, and shingle installation follow-through.
View roof replacement →
Ridge vents on architectural shingle
Materials: Architectural asphalt shingle + ridge vents
Problem: Roof replacement needed ventilation planned with the new system.
Scope: Install shingles, ridge venting, and ridge cap for a finished ventilation detail.
View roof replacement →
Multi-pitch re-roof at sunset
Materials: Architectural asphalt shingle
Problem: Multiple roof pitches and planes required careful staging and flashing sequencing.
Scope: Tear-off, dry-in, shingle install, and detail work across varied roof planes.
View roof replacement →
Architectural shingle, multi-gable
Materials: Architectural asphalt shingle
Problem: Multi-gable roof needed a clean finished system around siding and roof transitions.
Scope: Install shingle system, flashing transitions, ridge cap, and finish details.
View new construction roofing →
Bay window detail, new shingles
Materials: Architectural asphalt shingle
Problem: Small roof planes and bay-window details create leak-prone transitions when aged.
Scope: Targeted shingle and transition detail work around a bay-window roof section.
View roof repair →
Standing-seam metal under pines
Materials: Standing-seam metal
Problem: Tree exposure and snow considerations made a long-life metal system worth evaluating.
Scope: Standing-seam installation with trim and flashing details under pine exposure.
View metal roofing →
Steep-pitch shingle replacement
Materials: Architectural asphalt shingle
Problem: Steep-pitch roof needed replacement with access and safety planning.
Scope: Tear-off, dry-in, shingle replacement, and final cleanup on a steep roof face.
View roof replacement →